AGP Picks
View all

Construction scheduled to begin on US 52 south of Portal

BISMARCK, N.D. – Construction is scheduled to begin Monday, April 6, on U.S. Highway 52 south of Portal.

The project includes adding passing lanes at 8 locations from south of Portal to north of the Highway 5 and US 52 intersection. Drainage structures will also be extended at mile markers 17-19 and 23-24 to allow for the widening of the roadway. 

Shoulder work will take place when the project begins but eventually US 52 will be reduced to one lane. Flaggers and pilot cars will be used to guide traffic through the work zone as necessary. 

The speed limit will be reduced to 45 mph and a 14-foot width restriction will be in place during culvert work. 

The project is expected to be completed this fall.

The North Dakota Department of Transportation would like to remind motorists to slow down and use caution throughout the work zone.

For more information about construction projects and road conditions throughout North Dakota, call 511 or visit the ND Roads map at travel.dot.nd.gov.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

North Dakota Industry Watch

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.