Maintenance work scheduled on Grant Marsh Bridge Tuesday
BISMARCK, N.D. — The North Dakota Department of Transportation is scheduled to complete maintenance work on the eastbound Grant Marsh Bridge Tuesday, August 25, at mile point 157.
Work is planned to take place from 9 a.m. to 3:30 p.m. The passing lane will be closed and there will be a 12-foot width restriction in place while workers are present. The on-ramp from northbound Expressway to Interstate 94 eastbound will also be closed.
The North Dakota Department of Transportation would like to remind motorists to slow down and use caution throughout the work zone.
For more information about construction projects throughout North Dakota, check out the ND Roads app or visit travel.dot.nd.gov.
Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.