AGP Picks
View all

Overnight maintenance work scheduled for I-94 in Fargo tonight

FARGO, N.D. – Crews are expected to do repair work on Interstate 94 on Thursday, Oct. 8 beginning at 10 p.m.

North Dakota Department of Transportation crews will begin by replacing damaged crash barrels under the 42nd Avenue overpass. Once that work is complete, they will patch holes in both eastbound and westbound lanes of I-94 between the Main Avenue and Veterans Boulevard exits. They will wrap up by 5 a.m.

The crash barrel replacement is necessary for the safety of the public; the patching is to preserve the road and give a better ride to motorists.

NDDOT reminds drivers to slow down and use extra caution in work zones. Up-to-date road conditions and construction information can be found by calling 511 or visiting the ND Roads map at travel.dot.nd.gov.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

North Dakota Industry Watch

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.